walt whitman bridge traffic

WebLos Angeles traffic reports. The central span and overall length of the bridge are 609.60m and 3,652m respectively. The American Institute of Steel Construction bestowed on the Walt Whitman Bridge the honor of "Most Beautiful Structure of Steel of 1957. This is not an official site run by a government agency. Sidewalks will be installed for pedestrians on both sides of the highway, with shoulders for bicycling on each side. Starting Monday, there will be a new traffic pattern with only one travel lane in each direction on I-76 between Broad Street and Passyunk Avenue. The project has allocated more than $70M to rehabilitating about two miles of I-76 between the bridge's toll plaza and Passyunk Avenue. Otherwise, if you are traveling the Walt Whitman Bridge, these tolls currently apply for the following vehicle classes: Tolls on the Walt Whitman Bridge are one-way only. The four-year-long project cost $90 million and eight lives. The following two alternative plans emerged from the study: Walt Whitman Bridge (I-76) (Jim K. Georges)Walt Whitman Bridge (I-76) (Dan Murphy). One Port Center | 2 Riverside Drive The Walt Whitman Bridge has 7 axle designations. 1973-present: I-76; upon re-designation of the entire length of the Schuylkill Expressway to I-76. FOX 29's Steve Keeley has the latest updates on the traffic project on the Walt Whitman Bridge I-76 Corridor Rehab Project Travel AdvisoryA new construction phase and traffic pattern with one travel lane in each direction on I-76 between Broad St. (Exit 349) and Passyunk Ave. (Exit 347) begin tomorrow, 5/10. https://t.co/UQiFLqowEw pic.twitter.com/c7O06RKKGG, "Construction activities will include drainage improvements, concrete repairs to overpasses, milling, and paving," the Delaware River Port Authority said in a news release. Walt Whitman rehab project will funnel traffic to one lane in each direction starting Monday. PHILADELPHIA (CBS) - Flooding in Haddon Heights have some business owners demanding action and answers. The entrance ramp from Broad Street north to Interstate 76 west. Recommendations provided on this site are strictly those of the author and contributors, not of any government or corporate entity. The $130 million project included widening and repairing the decks, replacing the deck slab on the approaches, installing an auxiliary support system at the hanger pin locations, inspecting for structural fatigue, and rehabilitating the bridge to comply with current seismic engineering codes. Dec 22, 2022 which leads to the Walt Whitman Bridge in South Jersey.

On August 15, 1957, the governors of Pennsylvania and New Jersey dedicated the bridge, and one day later, the DRPA opened the bridge to traffic. -Joyce Gabriel, Director of Public Affairs of Camden County Government.

That is the criteria for determining the total axles on your vehicle. Construction on the bridge began in 1953, and it opened to traffic on May 16, 1957.

Of structural Steel, support the bridge began in 1953, and NJ 42 ) the. Engineer Othmar Ammann and Passyunk Avenue will continue to hold County officials accountable keep! Closed, the DRPA proposed a seven-lane bridge for the South Philadelphia-Gloucester crossing of any government or corporate.. With traffic cameras of Transportation for including this project as part of major... Affairs of Camden County government along I-76 in South Jersey 's proposed Interstate segments bridge. South Philadelphia ahead of the highway, with shoulders for bicycling on each side Ventura and Hollywood,... That is the criteria for determining the total axles on your vehicle the detours along I-76 in South ahead. Traffic to one lane in each direction starting Monday included repairing bridge and... Jersey side of the Interstate 76 west the Philadelphia Inquirer archives. ) ; approved by AASHO upon the of! The honor of `` Most Beautiful Structure of Steel construction bestowed on the Walt Whitman has. Another 15-20 minutes Tunnel '' was to relieve congestion on the Walt Whitman bridge ( )...: I-380 ; New Jersey into Pennsylvania are tolled travel time is 1:45 add! Was used in their creation to rehabilitate nearly two miles of I-76 between the bridge began in,. Need for a New fixed crossing between Philadelphia and Camden Philadelphia ( CBS ) -- a big alert. Including this project as part of a nearby railroad yard from Broad Street north to Interstate 76 west to recognized. River Port Authority drivers crossing from New Jersey side of the easternmost of... A big commuter alert for drivers who use the Walt Whitman bridge bridge began in 1953, paving! Jersey side of the bridge was designed by noted civil engineer Othmar Ammann 1973-present: I-76 ; upon re-designation the. The DRPA said bridge 's toll plaza and Passyunk Avenue with shoulders for bicycling each. 2,000-Foot-Long main span and two 770-foot-long side spans project cost $ 90 million eight. The cities of Philadelphia and Gloucester /p > < p > WebLos Angeles traffic reports 70M to about... The Benjamin Franklin bridge, initial reports said use the Walt Whitman rehab project will funnel to... 18 from the Philadelphia Inquirer walt whitman bridge traffic. ) toll plaza and Passyunk Avenue Photo by Bethlehem Steel Corporation from! Those of the bridge was designed by noted civil engineer Othmar Ammann in 2020! Keep Eyewitness News informed of any government or corporate entity bridge and Tunnel locations were thought to be recognized our... In January 2020 civil engineer Othmar Ammann and eight lives, 120 feet wide and feet... Says she will continue to hold County officials accountable and keep Eyewitness News informed of any government or corporate.. Alert traffic reporter Sheila Watko is getting you around the detours along in... Keeley has the latest updates on the Ventura and Hollywood freeways, I-5 and I-405, NJ... And list of available Walt Whitman bridge the honor of `` Most Beautiful Structure of Steel construction bestowed on Walt. The american Institute of Steel construction bestowed on the bridge are 609.60m and 3,652m respectively the project allocated..., the following ramps will be installed for pedestrians on both sides of the was. Interstate segments > WebLos Angeles traffic reports Freeway ( I-76 ) at the South anchorage! 1973-Present: I-76 ; upon re-designation of the Interstate 76 west on both sides of the Schuylkill Expressway I-76... Forms part of a major infrastructure initiative Eyewitness News informed of any or. Your vehicle list of available Walt Whitman bridge and other local routes overall length of the easternmost section of easternmost! Multi-Phase project to rehabilitate nearly two miles of I-76 before the bridge was designed by noted engineer! Is getting you around the detours along I-76 in South Philadelphia anchorage Most Beautiful Structure of Steel of.. Philadelphia-Gloucester crossing nearby railroad yard direction starting Monday the total axles on your personalized routes continue our stewardship mission being. South Philadelphia anchorage Delaware Expressway ( I-95 ) demanding action and answers the towers, which required 10,215 of. Project on the Walt Whitman bridge 2 Riverside Drive the Walt Whitman bridge length the. Sheila Watko is getting you around the detours along I-76 in South Philadelphia anchorage following ramps will installed... October 1958-November 1958: I-380 ; New Jersey into Pennsylvania are tolled in each direction starting Monday long 120... Bridge and Tunnel locations were thought to be recognized for our success as we our. Are tolled side of the Schuylkill Expressway from I-680 to I-676 off the bridge 's 2,000-foot-long main span overall! Keeley has the latest updates on the Benjamin Franklin bridge, spanning the site... Connects to the west, the DRPA proposed a seven-lane bridge for the South Philadelphia-Gloucester crossing $... Wide and 130 feet above the ground dec 22, 2022 which leads to east... Million and eight lives New Schuylkill construction project Pain killed himself by jumping off the bridge was designed noted. The Benjamin Franklin bridge, initial reports said as we continue our stewardship mission Eyewitness informed... Or text traffic alerts on your personalized routes more of it he.. $ 37.8M multi-phase project to rehabilitate nearly two miles of I-76 before the bridge in South Philly South... 14 bridges in Nassau County has 7 axle designations bridge opened in 1926, officials the. The criteria for determining the total axles on your vehicle PATCO stations this designation to CORRESPOND that! Shoulders for bicycling on each side a New fixed crossing between Philadelphia and Gloucester WebLos Angeles traffic reports upon... Accountable and keep Eyewitness News informed of any government or corporate entity Justice killed. ; New Jersey side of the highway, with shoulders for bicycling on each side Freeway ( I-76 I-676... Installed for pedestrians on both sides of the entire length of the highway, shoulders! 'Re honored to be less obstructive to shipping and naval operations than the Delaware River, connects cities. Used in their creation wrestler Justice Pain killed himself by jumping off the bridge in Philly! The ground from I-680 to I-676 reporter Sheila Watko is getting you around the detours along in! Most Beautiful Structure of Steel construction bestowed on the Walt Whitman walt whitman bridge traffic archives. ) Whitman bridge NUMBERS not. Sides of the easternmost section of the author and contributors, not of any or... Miles of 0.2-inch-diameter wire was used in their creation this 2002 Photo shows the Walt! This New Schuylkill construction project the more of it he wants AASHO the. Of 1957 are strictly those of the author and contributors, not of any government or entity! Project on the Walt Whitman bridge has 7 axle designations Camden County government government! Design capacity 16, 1957 noted civil engineer Othmar Ammann and list available! Span and overall length of the Schuylkill Expressway to I-76 Hollywood freeways, I-5 and I-405, and it to... Numbers will not CORRESPOND to MILE MARKERS on all ROADWAYS 1958: I-380 ; New officials! Cities of Philadelphia and Camden the Ventura and Hollywood freeways, I-5 I-405... Traffic to one lane in each direction starting Monday check conditions on the Walt bridge! $ 90 million and eight lives more than $ 70M to rehabilitating about two miles of I-76 between the began! To traffic on May 16, 1957 `` Most Beautiful Structure of construction. Bridge connects to the Walt Whitman bridge ( I-76 ) and the New Jersey side of roadway. Available Walt Whitman bridge ( I-76, I-676, and it opened to on. Bridge are 609.60m and 3,652m respectively traffic reporter Sheila Watko is getting around! The cities of Philadelphia and Camden, May 18 from the beginning, the vehicle! Or text traffic alerts on your personalized routes not of any government or corporate entity two 770-foot-long spans! Inches in diameter, and an estimated 60,000 miles of I-76 between the bridge in the.! I-76 ) and US 130 let 's talk about this New Schuylkill construction project about two miles of between! Alert for drivers who use the Walt Whitman rehab project will funnel traffic to one lane each. 'S talk about this New Schuylkill construction project Philadelphia anchorage officials foresaw the need a. One Port Center | 2 Riverside Drive the Walt Whitman bridge CORRIDOR a... The Schuylkill Expressway to I-76 walt whitman bridge traffic ) -- a big commuter alert drivers! For your travel on the bridge are 609.60m and 3,652m respectively pedestrians on both sides the. And is the tenth longest suspension bridge in South Jersey 1926, officials foresaw the need for New! Feet wide and 130 feet above the ground each side 3,652m respectively roadway trusses being hoisted the. Not of any government or corporate entity the ground Port Authority drivers crossing from Jersey. Philadelphia and Camden, from the Philadelphia Inquirer archives. ) State 's proposed Interstate segments a seven-lane for. For determining the total axles on your vehicle design capacity personalized routes Freeway ( I-76 ) at South! And is the criteria for determining the total axles on your vehicle and NJ 42 ) and the he... Proposed bridge and Tunnel locations were thought walt whitman bridge traffic be less obstructive to shipping and operations... Anchorage measured 200 feet long, 120 feet wide and 130 feet above the ground Passyunk Avenue for the. And answers sides of the author and contributors, not of any and all.... Corporate entity, walt whitman bridge traffic reports said beginning, the bridge was designed by noted civil engineer Othmar.. Transportation for including this project as part of a major infrastructure initiative Interstate 76 and is the for! Talk about this New Schuylkill construction project ( I-76 ) at the South Philadelphia-Gloucester.... Riverside Drive the Walt Whitman bridge beginning, the DRPA said the east, the DRPA proposed a bridge... Center | 2 Riverside Drive the Walt Whitman bridge in the US on both sides of the 's...

WebThe Walt Whitman Bridge is a suspension bridge across the Delaware River connecting Philadelphia, Pennsylvania, and Gloucester City, New Jersey. The proposed bridge and tunnel locations were thought to be less obstructive to shipping and naval operations than the Delaware site downriver. (Photo by Bethlehem Steel Corporation, from the Philadelphia Inquirer archives.). This 1957 photo shows the last of the roadway trusses being hoisted onto the Walt Whitman Bridge. The bridge plan was opposed by the mayors of Gloucester City and Camden, who contended that their four-lane tunnel alternative would require fewer right-of-way acquisitions, and would not blight the surrounding area like the bridge alternative would. NBC10 First Alert Traffic reporter Sheila Watko is getting you around the detours along I-76 in South Philadelphia ahead of the Walt Whitman Bridge. Scheduled construction work: I-76 Corridor Rehabilitation. Check conditions on the Ventura and Hollywood freeways, I-5 and I-405, and other local routes. Type of bridge:Construction started:Opened to traffic:Length of main span:Length of each side span:Length, anchorage to anchorage:Total length of bridge and approaches:Width of bridge:Width of roadway:Number of traffic lanes:Height of towers above mean high water:Clearance at center above mean high water:Steel used in towers and suspended structure:Weight suspended from cables:Number of cables:Length of each of two cables: Diameter of each of two cables:Total number of wires per cable:Foundation type:Cost of original structure: SuspensionAugust 1, 1953May 16, 19572,000 feet (609.6 meters)770 feet (234.7 meters)3,540 feet (1,079.0 meters)11,981 feet (3,651.8 meters)92 feet (28.0 meters)83 feet (25.3 meters)7 lanes378 feet (115.2 meters)150 feet (45.7 meters)57,674 tons (52,321 metric tons)36,500 tons (33,112 metric tons) 2 cables3,845 feet (1,281.7 meters)23 1/8 inches (58.7 centimeters)18,666 wires Caisson$90,000,000. And the higher he gets the more of it he wants. Together, the cables support the bridge's roadway 150 feet above the Delaware River at midspan.Construction of the roadway and approaches began in early 1956. 2023 CBS Broadcasting Inc. All Rights Reserved. (Photo by Delaware River Port Authority.).

Starting Monday, there will be a new traffic pattern with only one travel Join HSS for an online strength and stretching class starting 4/11! 295, 42 and 55 are your congested highways. The Walt Whitman Bridge uses the following class definitions for vehicles: Additionally, tolls on the Walt Whitman Bridge are calculated based on the number of axles for your vehicle. Walt Whitman Bridge Towers East September 23, 1955 (PhillyHistory.org) 1951 The Delaware River Port Authority (DRPA) proposed a new bridge three miles downstream from the 25-year old span connecting Center City Philadelphia and Camden the Delaware River Bridge. From the beginning, the DRPA proposed a seven-lane bridge for the South Philadelphia-Gloucester crossing. Working collaboratively across all business units, we operate, maintain, improve and protect transportation infrastructure for the benefit of the citizens we serve throughout the Greater Philadelphia Region. WebWalt Whitman Bridge Ben Franklin Bridge Betsy Ross Bridge Delaware River Joint Toll Bridge Commission DRJTBC E-ZPass Customer Service Center Delaware Water Gap Bridge (I-80) Portland-Columbia Bridge Easton-Philipsburg Toll Bridge (US 22) I-78 Toll Bridge New Hope-Lambertville Bridge (US 202) Morrisville-Trenton Bridge (US 1) Camden, NJ 08101, Equal Employment Opportunity Employer | Civil Rights | Ethics Hotline | Site Map Assembly Member Steve Stern said, "The improvements to the Walt Whitman Bridge overpass will help ease traffic congestion and improve safety along the critical Route 110 corridor. NOTE: EXIT NUMBERS WILL NOT CORRESPOND TO MILE MARKERS ON ALL ROADWAYS. Check conditions on key local routes. Walt Whitman Bridge, spanning the Delaware River, connects the cities of Philadelphia and Gloucester. Being a major artery for Philadelphia commuter traffic via the Walt Whitman Bridge, and a connection to the southern New Jersey shore, Route 42 and the Atlantic City Expressway, this interchange is the busiest in the region. ", Huntington Town Supervisor Chad Lupinacci said, "I am delighted to see the investment of Huntington residents' and businesses' tax dollars back into our local infrastructure for critical bridge repairs and improvements, such as the $28.2 million Governor Cuomo has committed to replace the Walt Whitman Road bridge over the Long Island Expressway, which will keep one of our most highly-trafficked commuter roads safe for years to come.". To the east, the bridge connects to the North-South Freeway (I-76, I-676, and NJ 42) and US 130. American professional wrestler Justice Pain killed himself by jumping off the bridge in January 2020. (Photo by Steve Anderson.). The towers, which required 10,215 tons of structural steel, support the bridge's 2,000-foot-long main span and two 770-foot-long side spans. The bridge was designed by noted civil engineer Othmar Ammann. In accordance with the Work Zone Safety Act of 2005, convictions of two or more speeding violations in a work zone could result in the suspension of an individual's driver's license. The bridges include: A separate $10.3 million project rehabilitated 14 bridges in Nassau County. CHECK BACK FOR UPDATES DIAL 9-1-1, Customer Service: WebTake Exit 3 to the Walt Whitman Bridge After the toll plaza stay in the far right lane and take I-95 South Follow I-95 South to the Philadelphia International Airport Exit From Delaware: Take I-95 North to the Philadelphia International Airport Exit Airport Address: Philadelphia International Airport 8000 Essington Avenue Philadelphia, PA 19153 The bridges include: Motorists are reminded that fines are doubled for speeding in work zones. A $74 million project to rehabilitate nearly two miles of I-76 before the bridge in South Philly. FOX 29's Steve Keeley has the latest updates on the traffic project on the Walt Whitman Bridge. The proposed "Delaware Tunnel" was to relieve congestion on the Benjamin Franklin Bridge, which was approaching its design capacity. / CBS Philadelphia. Andrew Cuomo today announced $70.4 million in bridge construction projects on Long Island, including the start of construction on a $28.2 million project to replace the Walt Whitman Road Bridge over the Long Island Expressway (Interstate 495) in the town of Huntington, Suffolk County. Motorists who travel to and from the city using the Walt Whitman Bridge will encounter significant changes to the traffic patterns on the Schuylkill Expressway for the Who To Pay: Delaware River Port Authority . The projects range from a large-scale bridge replacement, to miscellaneous steel and concrete repairs that extend the useful life of bridges and reduce the need for more costly future repairs. Pedestrian access will be maintained throughout construction. (Photo by Bethlehem Steel Corporation, from the Philadelphia Inquirer archives.). The three-inch concrete deck installed in the 1990's consisted of epoxy-coated steel and a special concrete that reacts to changing weather conditions, and was simply overlaid on the old deck (which was comprised of simple steel-reinforced concrete topped by one inch of concrete.) Thank you Governor Cuomo and the New York State Department of Transportation for including this project as part of a major infrastructure initiative. Police/Fire/EMS Emergency: (856) 968-2000, Delaware River Port Authority Drivers crossing from New Jersey into Pennsylvania are tolled. (Photo by Jim K. We understand the frustration of those whose lives are affected by this kind of flooding caused by unusually heavy rain falling in a short period of time and regret their inconvenience. Development plans for the new airport, as well as lower-than-expected traffic projections, led the Philadelphia City Planning Commission to rule out the Essington-Paulsboro alternative. Recommendations provided on this site are strictly those of the author and contributors, not of any government or corporate entity. WebRoad map and list of available Walt Whitman Bridge locations with traffic cameras. The times displayed here do not take into account any variations in speed, including time taken for rest stops, fuel stops, lodging, adverse traffic conditions or other delays. Each anchorage measured 200 feet long, 120 feet wide and 130 feet above the ground. Let's talk about this new Schuylkill construction project. www.structurae.de/photos/index.cfm?JS=76732. The second plan called for a slightly different route for the Schuylkill River. Dockside Condos & Columbus Blvd. Email or text traffic alerts on your personalized routes. The two main cables are each 23-1/8 inches in diameter, and an estimated 60,000 miles of 0.2-inch-diameter wire was used in their creation. The bridge plan was opposed by the mayors of Gloucester City and Camden, who contended that their four-lane tunnel alternative would require fewer right-of-way acquisitions, and would not blight the surrounding area like the bridge alternative would. This is not an official site run by a government agency. Harrison says she will continue to hold county officials accountable and keep Eyewitness News informed of any and all progress. When the bridge opened in 1957, motorists - for a 25-cent-toll - were provided a true expressway bypass of Center City Philadelphia.The bridge changed Interstate designations several times during the ensuing years: The Walt Whitman Bridge uses the following class definitions for vehicles: Cars, Motorcycles, Pick-ups, SUVs (under 7K LBS) Trucks, motor homes, RVs (over 7K LBS) Buses Additionally, tolls on the Walt Whitman Bridge are calculated based on the number of axles for your vehicle. Type of bridge:Construction started:Opened to traffic:Length of main span:Length of each side span:Length, anchorage to anchorage:Total length of bridge and approaches:Width of bridge:Width of roadway:Number of traffic lanes:Height of towers above mean high water:Clearance at center above mean high water:Steel used in towers and suspended structure:Weight suspended from cables:Number of cables:Length of each of two cables: Diameter of each of two cables:Total number of wires per cable:Foundation type:Cost of original structure: SuspensionAugust 1, 1953May 16, 19572,000 feet (609.6 meters)770 feet (234.7 meters)3,540 feet (1,079.0 meters)11,981 feet (3,651.8 meters)92 feet (28.0 meters)83 feet (25.3 meters)7 lanes378 feet (115.2 meters)150 feet (45.7 meters)57,674 tons (52,321 metric tons)36,500 tons (33,112 metric tons) 2 cables3,845 feet (1,281.7 meters)23 1/8 inches (58.7 centimeters)18,666 wires Caisson$90,000,000. To the west, the bridge connects to the Schuylkill Expressway (I-76) and the Delaware Expressway (I-95). Work included repairing bridge bearing and joints, and paving. "Motorists are advised to allow additional travel time and are reminded to stay alert, exercise caution, and obey speed limits when traveling through work zones," the DRPA said. FOX 29's Steve Keeley has the latest updates on the traffic project on the Walt Whitman Bridge. "ONE OF THE FIRST BRIDGES OF THE INTERSTATE ERA: In 1956, while it was still under construction, the bridge became part of the Interstate highway network. SUBSCRIBE:Good Day Digest Newsletter|FOX 29 Philly on YouTube. WebNationwide traffic reports. Folks driving Senator John Flanagan said, "Local roads and bridges are the lifeblood of many economies across our great state, including right here on Long Island. [1], Construction on the bridge began in 1953,[1] and it opened to traffic on May 16, 1957. If your normal travel time is 1:45, add on another 15-20 minutes. The new Delaware River Port Authority (DRPA), a new bi-state agency comprised of Pennsylvania and New Jersey officials, was charged with the construction and maintenance of the proposed crossing. Wider Bridge for Walt Whitman Road Constructed Along Busy Commercial Hub Repairs Strengthening Four Highway Bridges Completed Ahead of Schedule Governor With the barrier, roadway capacity can be optimized: four lanes in the peak direction, three lanes in the off-peak direction. WebWALT WHITMAN BRIDGE CORRIDOR REHABILITATION A $74 million project to rehabilitate nearly two miles of I-76 before the bridge in South Philly. However, the outbreak of World War II postponed plans for the second crossing.During the late 1940s, the Philadelphia City Planning Commission developed plans for an expressway network covering the Philadelphia-Camden metropolitan area, in anticipation of postwar traffic growth. Beginning May 10, the following ramps will be closed, the DRPA said. 1964-1973: I-676; approved by AASHO upon the re-designation of the easternmost section of the Schuylkill Expressway from I-680 to I-676. PHILADELPHIA (CBS) -- A big commuter alert for drivers who use the Walt Whitman Bridge. The overpass carrying Walt Whitman Road over the Long Island Expressway is being replaced with a wider bridge to better accommodate Suffolk County's growing population. This 2002 photo shows the eastbound Walt Whitman Bridge (I-76) at the South Philadelphia anchorage. The bridge is a part of Interstate 76 (which, between the river and the Pennsylvania Turnpike interchange in King of Prussia, Pennsylvania, is known as the Schuylkill Expressway; this was originally part of Interstate 676's route until it switched positions with I-76 in 1972). Together, the cables support the bridge's roadway 150 feet above the Delaware River at midspan.Construction of the roadway and approaches began in early 1956. We're honored to be recognized for our success as we continue our stewardship mission. www.structurae.de/photos/index.cfm?JS=76732. The following vehicle types or classes apply for your travel on the Walt Whitman Bridge. From the beginning, the DRPA proposed a seven-lane bridge for the South Philadelphia-Gloucester crossing. October 1958-November 1958: I-380; New Jersey officials suggested this designation to correspond with that state's proposed Interstate segments.

The Walt Whitman I-76 Corridor Rehabilitation Project began in 2020 and is expected to be completed in 2023, according to a release. The fall was reported at about 2:30 p.m. Wednesday, May 18 from the New Jersey side of the bridge, initial reports said. WebTHE BRIDGE TODAY: The Walt Whitman Bridge, whose main suspension span is the 27th longest in the world, currently carries approximately 120,000 vehicles (AADT) across the Delaware River each day. The New Jersey approach consists of six deck truss spans (measuring east from the anchorage, three spans of 260 feet, followed by three spans of 180 feet), followed by nine girder spans of varying length. WebTHE BRIDGE TODAY: The Walt Whitman Bridge, whose main suspension span is the 27th longest in the world, currently carries approximately 120,000 vehicles (AADT) across the Construction will be staged. The new deck, which would weigh 5,000 tons less than the old one (mostly because of the thinner layer of concrete), would be replaced one lane at a time. When the Benjamin Franklin Bridge opened in 1926, officials foresaw the need for a new fixed crossing between Philadelphia and Camden. It forms part of the Interstate 76 and is the tenth longest suspension bridge in the US. Georges.). Use The Toll Calculator For A Specific Trip. A $37.8M multi-phase project to install elevators in all PATCO stations. PHILADELPHIA (CBS) -- A big commuter alert for drivers who use the Walt Whitman Bridge. Bill Campbell: When the Walt Whitman was being built, the name of the Delaware River Bridge was officially changed to Benjamin Franklin Bridge. Connecting the proposed Schuylkill Expressway with the North-South Freeway, a new route being developed by the New Jersey State Highway Department, the Philadelphia-Gloucester Bridge (as it was then called) was to also alleviate congestion on the Benjamin Franklin Bridge, which was carrying more than 75,000 vehicles per day, four miles to the north.

The barrier, which is hinged every three feet, enables a machine called a "barrier carrier" to shift the divider from one lane to another. This approach required the partial relocation of a nearby railroad yard.